75,000 m² in the desert
Design and site supervision for the lining of a canal with encapsulated concrete mattress: panels of 34 to 35 metres, 50 cm anchors, up to six concrete trucks a day and winds of 30 to 40 km/h.
The crew did not exist and we trained it ourselves: thirteen installers —five from India and eight from Uganda— trained with the ILUO method until they could work independently on site.