Canindeyú bridge
Canindeyú · approximate location
1,400 m²of concrete mattress
- Product
- Concrete mattress
- Condition
- Active abutment erosion
- Sector
- Bridges and viaducts
The problem
The bridge abutments were already eroded: the current had begun to undermine the structure.
The solution
Abutments lined with concrete mattress, which adapts to the already deformed ground and stops the scour.
The result
Fourteen hundred square metres that stopped damage in progress.
The project in pictures
8 photos