Gasory Stream bridge
Paso Yobái, Guairá · approximate location
860 m²of concrete mattress
- Product
- HYDROTEX AB400, 100 mm, cables in both directions
- Year
- 2024
- Sector
- Bridges and viaducts
The problem
The stream current was scouring the bridge abutments and piers. Unprotected, every flood took material from the foundation.
The solution
Abutments and piers were lined with 100 mm AB400 concrete mattress, with reinforcing cables in both directions so the lining works as one piece.
The result
Eight hundred and sixty square metres protecting the most expensive structure of the crossing: the bridge.