km 10 viaduct ramps, Ciudad del Este
Ciudad del Este, Alto Paraná · approximate location
4,000 m²of walls across both viaducts
- System
- Lock+Load block wall, with geogrid in the backfill
- Ece's scope
- Supply, site management and construction
- Status
- Under construction
- Sector
- Road infrastructure
The problem
The viaduct's access ramps must retain the embankment on a busy avenue, with traffic running alongside and no room for slopes.
The solution
Lock+Load block wall: each block is anchored in the backfill with its counterfort and gravel, with geogrid behind the facing.
The result
Under construction. Together with the Las Residentas viaduct, the two projects add up to 4,000 m² of walls.
The project in pictures
9 photos









Do you have a similar problem?
We visit the site, measure and bring you a proposal. If the project is already specified, we can also review it with you.