Geocells on rural roads
Forestry estate, Paraguay · approximate location
2,500 m²of geocells over 2.5 km
- Product
- Geocells filled with local material
- Duration
- 1 day
- Sector
- Agribusiness
The problem
The main logistics road of a forestry estate became impassable in the rain, and the fill material was lost every season.
The solution
Geocells filled with local material on the critical stretches: confinement multiplies the bearing capacity of the same soil.
The result
Two thousand five hundred square metres over two and a half kilometres of road, installed in one day.