Eastern Metropolitan Corridor
Ciudad del Este, Alto Paraná · approximate location
100,000 m²of hydroseeding
- Product
- Hydroseeding with mulch, pH corrector, nutrients and micro-organisms
- Duration
- 3 months
- Soil
- Clay, heavy rains
- Sector
- Road infrastructure
The problem
Ditches and slopes of red clay soil with intense rains: every storm opened new gullies beside the carriageway.
The solution
Hydroseeding with mulch, pH corrector, nutrients and micro-organisms over 100,000 m², in three months.
The result
The ditches you see today beside the crops were gullied before the intervention.
Before and after
Eroded ditch before the works
Drag to compare


The project in pictures
10 photos










Do you have a similar problem?
We visit the site, measure and bring you a proposal. If the project is already specified, we can also review it with you.