Eastern Metropolitan Corridor

Eastern Metropolitan Corridor

Ciudad del Este, Alto Paraná · approximate location

100,000 m²of hydroseeding
Product
Hydroseeding with mulch, pH corrector, nutrients and micro-organisms
Duration
3 months
Soil
Clay, heavy rains
The problem

Ditches and slopes of red clay soil with intense rains: every storm opened new gullies beside the carriageway.

The solution

Hydroseeding with mulch, pH corrector, nutrients and micro-organisms over 100,000 m², in three months.

The result

The ditches you see today beside the crops were gullied before the intervention.

Before and after

Eroded ditch before the works

Drag to compare

After
Before
BeforeAfter
The project in pictures

10 photos

El talud revegetado junto a la ruta
El talud revegetado junto a la ruta
+
La banquina tratada a lo largo del camino
La banquina tratada a lo largo del camino
+
El talud con la vegetación establecida
El talud con la vegetación establecida
+
Vegetación densa sobre el talud tratado
Vegetación densa sobre el talud tratado
+
El canal de desagüe con el talud revegetado
El canal de desagüe con el talud revegetado
+
El terraplén tratado en perspectiva
El terraplén tratado en perspectiva
+
El talud revegetado junto al camino de tierra roja
El talud revegetado junto al camino de tierra roja
+
Vegetación establecida sobre el talud tratado
Vegetación establecida sobre el talud tratado
+
El desagüe revegetado al costado de la ruta
El desagüe revegetado al costado de la ruta
+
El talud tratado con la banquina de tierra roja
El talud tratado con la banquina de tierra roja
+

Do you have a similar problem?

We visit the site, measure and bring you a proposal. If the project is already specified, we can also review it with you.

Message us