Pilar — diversion channel

Pilar — diversion channel

Pilar, Ñeembucú

750,000 m²of revegetated slopes
Product
Reinforced revegetation with turf reinforcement mats
Length
14 km channel
The problem

The channel that diverts water around the town has 14 km of bare-soil slopes: unprotected, every rain gullies them and the sediment goes back into the channel.

The solution

The slopes were revegetated with hydraulic blanket and turf reinforcement mats, which hold the roots until the vegetation establishes and then keep working inside the soil.

The result

Seven hundred and fifty thousand square metres of slope protected with vegetation, the largest item of the Pilar works after the mattress.

The project in pictures

9 photos

Aérea del canal de derivación cruzando el pueblo
Aérea del canal de derivación cruzando el pueblo
+
El canal revegetado con el agua corriendo
El canal revegetado con el agua corriendo
+
El canal verde en perspectiva, con el monte al fondo
El canal verde en perspectiva, con el monte al fondo
+
Rollos de manta orgánica al pie del canal
Rollos de manta orgánica al pie del canal
+
Rollos de manta en su malla, listos para tender
Rollos de manta en su malla, listos para tender
+
El canal revestido con la manta, antes de revegetar
El canal revestido con la manta, antes de revegetar
+
El canal revestido en perspectiva, con el agua
El canal revestido en perspectiva, con el agua
+
El canal terminado con la manta y el agua
El canal terminado con la manta y el agua
+
Macro de la fibra de la manta orgánica
Macro de la fibra de la manta orgánica
+

Do you have a similar problem?

We visit the site, measure and bring you a proposal. If the project is already specified, we can also review it with you.

Message us