Transchaco Highway — lot 5

Transchaco Highway — lot 5

PY09 Highway, Chaco · approximate location

450,000 m²of protected slopes
Product
Hydraulic blanket on slopes; blanket + turf reinforcement mat at 5 culverts (8,300 m²)
Soil
Dispersive and expansive, few nutrients, little rain
Second stage
100,000 m² of hydroseeding in 20 days on the untreated sections
The problem

Chaco soil is dispersive: it dissolves in water. Culvert outlets and channels down to the watercourse were scouring, and the lot's slopes eroded before anything could grow.

The solution

Four hundred and fifty thousand square metres of slopes with hydraulic blanket, and an integral system at five culverts: blanket plus turf reinforcement mat from the culvert edge to the watercourse. Then 100,000 m² of hydroseeding with mulch, pH corrector, nutrients and micro-organisms in 20 days on the sections left untreated.

The result

Slopes, ditches and outlets working as one system in the country's most difficult soil.

Before and after

Scoured culvert outlet

Drag to compare

After
Before
BeforeAfter
The project in pictures

8 photos

La geomanta instalada sobre el talud del canal
La geomanta instalada sobre el talud del canal
+
El pasto establecido sobre el tratamiento
El pasto establecido sobre el tratamiento
+
El mulch aplicado en el canal, antes de germinar
El mulch aplicado en el canal, antes de germinar
+
La geomanta con las grapas de anclaje a la vista
La geomanta con las grapas de anclaje a la vista
+
El equipo trabajando sobre el canal revestido
El equipo trabajando sobre el canal revestido
+
El pasto denso establecido en la canalización
El pasto denso establecido en la canalización
+
El canal tratado junto a la ruta
El canal tratado junto a la ruta
+
La geomanta cubriendo el talud, en perspectiva
La geomanta cubriendo el talud, en perspectiva
+

Do you have a similar problem?

We visit the site, measure and bring you a proposal. If the project is already specified, we can also review it with you.

Message us