Puerto Indio — platform and slopes
Puerto Indio, Alto Paraná · approximate location
480,000 m²of slopes with hydraulic blanket
- Product
- Wood-with-tack hydraulic blanket on slopes; StrataSlope wall on the crushing platform
- Wall pace
- 25 to 30 m² per day
The problem
The primary crushing plant needed a retained platform on red soil, and the project's fill slopes needed large-scale erosion protection.
The solution
StrataSlope reinforced-earth wall for the platform, and 480,000 m² of slopes protected with hydraulic blanket.
The result
The wall's pace was decided by the project's volume: fewer people, slower progress and a reasonable fixed cost. A wall never advances faster than the compacted fill behind it.